English

For RTEs: shared planning needs every perspective

In PI Planning, many team plans come together into one picture. As a Release Train Engineer, you need a brief, clear check that includes remote participants and opens a discussion about unresolved dependencies.

Sign in with your facil4 account to create a poll. Participants do not need an account.

Assess the PI plan together

After plans and dependencies have been presented, use the PI Planning template. It asks about deliverability and ranges from not deliverable to realistic. Name the plan version, PI Objectives and the Planning Interval so everyone assesses the same basis.

Do not infer cross-team alignment from an average

A confident overall score can hide different perspectives. Look at the distribution and ask which dependencies still lack workable agreements. facil4 shows aggregate votes; it does not attribute them to teams. A deeper investigation needs a conversation with the affected groups.

Provide the same access in hybrid planning

Display a QR code in the room and share the direct link in the meeting chat. Read the question and scale aloud and give both groups time. Open results only after everyone has had a chance to participate. The facilitator needs an account; participants do not. No capacity guarantee for specific group sizes is implied here.

Make revisions traceable

When confidence is low, clarify scope, capacity and dependencies. Record changes and owners in the plan. A new vote assesses the revised version; the previous one remains stored. The follow-up guide helps you facilitate this step without making repeated voting an end in itself.

Ready for your vote?

Open the template in the cockpit, sign in and review the question. Create and start the vote before sharing the link or QR code.

Start a PI Planning confidence vote

Explore next